Golden Eagle Project - North Prospect - 2009 Significant Drill Results

Hole #

From

(m)

To

(m)

Interval

(m)

Gold

(g/t)

Silver

(ppm)

Antimony

(ppm) 

Arsenic

(ppm)

Bismuth

(ppm)

Copper

(ppm)

Lead

(ppm)

Zinc

(ppm)

N0901

76.75 164.59 87.84 0.11              
incl 76.75 80.46 3.71 0.23 24.43 13 - 159 124 - 4900     34 - 1380 162 - 1330
incl 128.11 143.80 15.70 0.17   2 - >10000 116 - >10000     5 - 994 53 - 1080
and 128.10 131.98 3.88 0.57              
incl 149.35 164.59 15.24 0.33   10 - 336 466 - 5380         
 

N0902

43.70 48.40 4.70 0.40              

incl

46.37 48.40 2.03 0.23 34.41 20 - 532 94 - 5300 20 - 66   818 - 1510  
 

N0903

109.92 112.04 2.12 0.74 58.41 109 - 4220 1330 - >10000 3 - 557 129 - 1515 131 - >10000 162 - 4310
  115.58 117.58 2.00 0.21 12.05 134 - 445 1970 - 4310 8 - 38 134 - 160 279 - 1020 208 - 223
  128.40 132.90 4.50 0.25 34.43 57 - 817 282 - 3010 11 - 107 43 - 998 169 - 6700 156 - 4430
 

N0904

      NSV              
 

N0905

15.85 20.66 4.81 0.1   27 - 165 483 - 7200        
  33.50 39.62 6.12 0.19 4.54 15 - 677 220 - >10000     16 - 671  

incl

34.60 35.60 1.00 1.04 22.35            
  43.90 50.90 7.00 0.21 10.61 16 - 671 161 - >10000     27 - 1825  

Interval represents down hole core lengths; true widths cannot be reliably estimated at this time.